As of this weekend, we have every appliance in and working.  Double ovens and dishwasher included.  Before we could install either, we had to add face trim to our cabinet boxes, fill, sand, prime, and paint.  Each cabinet box is made from double-sided melamine, leaving the inner particle board exposed along the fronts.

Kitchen-Cabinets-Installed-Wall-Oven

After talking to custom cabinet makers, we chose melamine for a few reasons.  Unlike plywood, it doesn’t warp as it dries.  Melamine sides also protect the inside from water, without having to paint the inside of every box.  For sleek, finished fronts without seams at every cabinet joint, we prefer to face our cabinets after install.  Below you can see the 3/4 inch painted poplar front added to the melamine box.

Kitchen-Cabinet-Frames

Without fronts, the drawers are recessed about 1/4 inch to allow a tight closure against the cabinet.

Kitchen-Cabinet-Face-Frames

Rather than using plywood for end panels, we used paintable melamine panels.  Having never used these before, I worried the smooth surface wouldn’t take paint well.

Kitchen-Paintable-End-Panel

Turns out, one primer + three paint coats covers flawlessly.  I tried scratching the paint off with my nail and nothing happened, so I’m very hopeful.  The guys at Sherwin Williams highly recommended their ProClassic paint for cabinets because it levels and hardens for a durable finish.  Using an angled brush and small foam roller, I applied satin finish Snowbound.  This paint dries quickly, with a super smooth finish.  Brush strokes faded away.

Kitchen-Cabinets-Dishwasher-End-Panel

Framing the fridge, ovens, and dishwasher just adds to the custom feel and really finished it all off.  While I got my paint on, Ben set the two office drawer stacks.

Office--Cabinets-Set

Once the paint dried, we couldn’t get the new ovens in soon enough.  Removing the doors made hoisting it easier.

Kitchen-Double-Ovens-Install

Thanks to Ben’s measuring and remeasuring the cabinet and ovens fit perfectly.  Almost as if they were made for each other.  Oh wait, they were.  It slid right in place, with only a minor tweak of the upper panel.

Kitchen-Installing-Double-Ovens

Ta-da!  LG suggests leaving at least 12 inches from the floor, so we added a drawer below.  This drawer is the same size as the other bottom ones, which also brought the height even with the top of the refrigerator.

Kitchen-with-Double-Oven

After install, we pulled off the packing materials, which left some marks on the doors.

Double-Oven-Stainless-Before-Cleaned

We’ve tried various cleaners over the years, but nothing worked well on our LG fridge.  At the end of my rope, I asked my friend Jamie what miracle cure she used.  She sent me a picture of the spray can: Weiman Stainless Steel Cleaner and Polish.  I couldn’t find the spray, but I did find the wipes.

Weiman-Stainless-Steel-Wipes

Let me tell you, these are almost as magical as the Magic Eraser.  Seriously, how do those things work on almost everything?!  Anyway, I wiped with the steel grain, then followed up with a dry rag.

Double-Oven-Stainless-Cleaner

Look at the difference between the cleaned top and untouched bottom.

Double-Oven-Stainless-Cleaned-Top

After seeing how well the wipes worked on the ovens, I literally polished every other stainless surface in the house.  The bathroom counters and shower pan have never looked better.  No, this is not sponsored.  Just thought this life changing cleaner was worth mentioning.  Unless I’m the last person to know about these.  In that case, carry on.

Soap Stone

We’ve splurged on many elements in the kitchen: slate tile floors, a gas cooktop, custom stainless sink, and double wall ovens mainly.  Wanting to get it right the first time, regret free, we can justify these expenses.  To balance out the large ticket items, we’ve saved money by tackling everything ourselves and finding deals where we can.  By leaps, the best score for list price to our deal ratio has been soap stone remnants for the counters.

We’ve been in a local granite and marble supplier to be somewhat friendly with the place.  A few weeks ago, on a reconnaissance trip, we started chatting with the owner about matte finish stones.  For whatever reason, I really wanted a lower sheen for the counters.  He suggested either leathered granite, priced between $80-$90 per square foot, and soap stone.  Honed granites aren’t as highly polished as a standard granite, creating a matte finish.  But if something slides across, it basically acts as a sand paper, leaving scuff marks.  Unlike honed granite, leathered granite is finished with brushes, creating a smooth, but low sheen finish.  Leathered granite isn’t very common here yet, so there were only a few options, but I really liked the look.  Then he showed us a gorgeous soap stone slab.  Love at first sight, people.

Realizing we really liked it, he walked us over to a stack of remnants, where he had 6 pieces of a similar soap stone.  We asked about a million questions, he patiently answered each one and told us the pros and cons.  Pro: it’s easy to cut and work with, perfect for a DIYer.  Con: soap stone is soft and can scratch and chip easier than granite.  List price is $82 per square foot.  The six-foot by 2 foot section to the left of the sink alone would cost $984.  Now add in the $328 for the 4 feet over the dishwasher and another $656 for the small cabinet across from the table.  That’s $1968, just for three sections of stone countertops.

Then he made us an offer we couldn’t refuse.  One hundred bucks for all six chunks; enough for the kitchen plus a few extra odd sections.  Sold, to the couple in the front row.  I quickly drove home to get the pick up to haul everything home.  I have no idea what particular variety this is, but it has a lot of mottled veining.  Here’s an uncut, unpolished piece.

Soap-Stone-Counters-Before

Soap stone is a very DIY friendly natural counter because it’s dense, but soft.  Ben has cut granite and marble before, but this was a lot easier.  He used a standard circular saw to cut the edges and our orbital sander to finish the edges.

Kitchen-Soap-Stone-Counter-Overall

After installing the pieces, I applied an oil to bring out the character.

Kitchen-Soap-Stone-Counters-Detail

This step is simply preference, but think of it as a clear coat on wood.  It helps protect, but also show off the natural beauty.

Kitchen-Soap-Stone-Toward-Ovens

With white perimeter cabinets and a light backsplash planned, we wanted dark counters for contrast.  I think they’re perfect.

Kitchen-Soap-Stone-Counters-and-Sink

Of course, there are still to do’s, but let’s focus on what is finished.

Kitchen-Soap-Stone-Counters-and-Sink-Side

For a seamless edge, we carried the stone to the inside edge of the sink.

Kitchen-Sink-with-Soap-Stone

Kitchen-Soap-Stone-and-Sink-Dishwasher-Side

Kitchen-Soap-Stone-Above-Dishwasher

Now that the counters are in, we were able to add cabinet trim and start painting.  Most importantly, with the painted face trim, we could install the double ovens.  More on that soon.

Having never had soap stone, do you have experience with it?

Now We’re Cookin’

Remodeling a kitchen can be tough.  I know, shocker.  Kitchens are the heart of the home, used many times each day.  Sometimes taken for granted.  You know how it feels when the electricity goes out: you go to do something completely ordinary, like turn on a light, and only after do you remember the power is out?  Yeah, that’s kind of how it is living without a kitchen.  With each new, functional piece, it feels like Christmas morning.  Well, Merry Christmas and happy new year to us because we’ve got a cooktop.

Cooktop-in-Kitchen

A functioning, 48 inch, 6 burner and griddle cook surface was exciting before the remodel, but downright thrilling now.  It fits perfectly in the island, completing the cook show stage.  Ha!  We decided to reuse the maple butcher block counter, too.  It was really nice to have a built-in, oversized cutting board.

Kitchen-Cooktop-in-Island

We chose a GE Monogram after reading reviews on many other brands.

Cooktop-in-Island-Side

All burners are the exact same.  There’s an extra high setting that heats up in a hurry.

Gas-Cooktop-High-Setting

And an ultra low simmer that GE demos by melting chocolate chips on a paper plate.  I kind of want to give that a try.  I mean, that’s usually how I melt chocolate.

Gas-Cooktop-Simmer-Setting

If you’re into wok cooking, each grate flips to hold a wok.  Note to self, must learn how to make delicious Asian food.

Kitchen-Cooktop-Grate-FLipped

I knew I missed having a gas top, but it really is so different from electric.  Temperature changes are instantaneous.  It’s sleek, streamlined, and pretty.  Once the cabinets are faced out and drawer fronts are on, the sides won’t stick out as far.

Cooktop-Side-Detail

There have been several questions about the sink, too.  We had it custom-made by Venus Fabrication in Texas.

Kitchen-Sink-from-Above-Clean

Like the cooktop, it’s stunning.  I’ll admit, it wasn’t cheap, but it is the most used part of a kitchen and totally worth it.

Kitchen-Sink-with-Dishwasher

To balance out the wide cooktop, we widened the sink from 30 to 36 inches.  Best decision ever.  Soaking pans and cookie sheets is easy.

Kitchen-Sink-Installed-with-Faucet

Similar to our custom sink for our last house, this sink is the full counter depth.  Neither Ben or I are fans of the skinny strip of counter along the backs of sinks.  Instead, the counters will rest on top of the sides, leaving the back open.

Kitchen-Sink-from-Above

As with the cooktop, (seriously, how many times have I said that already?!) the cabinet faces will make the reveal smaller.

Kitchen-Sink-Bottom-Detail

Now we’re only missing the double oven.  Before we can install the ovens, we need to attach the face trim to the cabinet boxes, prime, and paint.  From there, everything left to do is mostly for looks.

Work Zones

Before tearing the kitchen apart, I used Photoshop to build a to scale floor plan to make sure the changes worked on paper.

Kitchen-Floor-Plans-New-Details

We’ve already made a lot of progress on the main kitchen area, but still not fully functional.  Gas and electric still need to be run for the cooktop and the dishwasher has to get hooked up.  To get the wall ovens in, we’ll have to frame and paint the cabinets.  Clearly things are very much a work in progress.

Kitchen-Base-Cabinets-Island-Back-Toward-Sink

Less necessary areas, ahem the office, have taken a back seat for now.  That doesn’t mean there aren’t plans.  Oh no, the office is seeing a slightly different layout.

Painted-Office-from-Kitchen

Instead of the L shape, we’re keeping the cabinets to the long wall only.

Kitchen-Remodel-Empty-Office-Plans

This will allow us to install a wider sliding door out to the pool house.  Currently, the pool house is a hot mess, but eventually, when it is pretty, we’ll appreciate the connection.

Kitchen-Remodel-Empty-Office-Plan-Drawings

Working around the wider door leaves a 9 1/2 foot long stretch to work with.

Kitchen-Remodel-Empty-Office

Two 36 inch wide base drawers will sit on either end, leaving a chair gap centered below the window.

Kitchen-Remodel-Office-Drawings

It looks as though we’re losing a lot of cabinet space, which we are, if you go by linear measurements.  Similar to the kitchen cabinets, there was a lot of wasted space.  Having all drawers for the lowers offers more usable storage.  Another untouched area is along this small stretch of wall along the dining room.

Kitchen-to-Dining-Blank-Wall

A four-foot wide base cabinet will work as an appliance garage of sorts.  Storage for the microwave behind closed doors as well as the coffee maker.  Just a small area to set up without being in the main traffic side.

Kitchen-to-Dining-Blank-Wall-Cabinet-Sizing

Eventually, Ben wants to hang a TV over it.

Ready, Set, Cabinets

Onward with the kitchen remodel.  After dealing with the floors and laying new tile, we took a few days off before grouting.  Tile’s all fun and games until you’ve spent four days on your knees.  Once grouted, we were able to clean the haze and install cabinets.

Kitchen-Slate-Tile-Cleaning

Ben started with the sink, centering it under the window.  He built toe kicks using 2 by 4 boards on edge, working around a vent and leveling as he went along.

Kitchen-Base-Cabinet-and-Sink-Installed

The floor on the far end is about an inch lower than the sink, so he shimmed the toe kick to avoid adjusting the cabinet boxes.  This way, the toe kick covers will hide the variance.  At the end of night one, we had a functioning sink, two drawer stacks, and the drawer below the wall ovens in.

Kitchen-Base-Cabinets-Sink-Side-Installed

Looky there, an island!

Kitchen-Base-Cabinet-Install-Both-Sides-from-Office

To accommodate the cooktop, the two center cabinets are about 9 inches shorter.

Kitchen-Base-Cabinet-Installing-Island

After living with a single level island and stove combo, we knew we wanted to create a raised bar for separation.  Potential burns just aren’t worth one level.  For adequate counter support, Ben built a wall that is six inches taller than the cabinets.

Kitchen-Cabinet-Install-Island-Wall

He’ll run the gas for the range through here.  Creating the raised bar also gives a convenient place for outlets, which we much prefer over end boxes.

Kitchen-Base-Cabinets-Installed

With the fridge in place, the kitchen is half functional again.

Kitchen-Base-Cabinets-Island-Side

Some of the drawers are loaded up with essentials.  Including the trash that will stay under the cooktop.

Kitchen-Base-Cabinets-Island-Back-Toward-Sink

The last thing to go in will be the wall ovens.  After cabinet faces and paint.

Kitchen-Cabinets-Installed-Wall-Oven

But the sink, that makes life a heck of a lot easier.

Kitchen-Base-Cabinets-and-Sink-Side

Two more base and three uppers to go.  Things are taking shape!